SUEZ CEMENT
EPC of The Monorail Electric LV package project including:
Engineering, Supplying and Installation of:
Engineering, Supplying and Installation of:
LV PACKAGE
-
LVdistribution panels
-
Feeding cables
-
Wiring devices
(Floor boxes and sockets) for station rooms and workstations and wiring devices
(Floor boxes and sockets).
EPC of The Monorail Electric Switch Beam project will include a 54km line connecting the New Administrative City with East Cairo and a second 42km line connecting 6th of October City
with Giza
Cairo Monorail’s New Administrative Capital line features 22 stations while the 6th of October City line will have 12 stations
with Giza
Cairo Monorail’s New Administrative Capital line features 22 stations while the 6th of October City line will have 12 stations
ELECTRIC SWITCH BEAM INSTALLATION
EPC of Cable TraysRouting inside stations of the whole line starting from the New Capital which is consisting of its Depot and 22 stations till 6th October which is consisting of its Depot and 12 stationsCairo Monorail’s New Administrative Capital line features 22 stations while the 6th of October City line will have 12 stations
BUILDINGS CABLE TRAYS
Project Tasks
LV PACKAGE
92%
ELECTRIC SWITCH BEAM INSTALLATION
80%
BUILDINGS CABLE TRAYS
92%